When a critical tool is late, the cost shows up fast. Missed press time, delayed launches, and unnecessary disruption all add up quickly when timing slips.
That is why RotoMetrics introduced Fast Lane, an expedited production option for select tools, designed for moments when waiting is the most expensive choice.
Fast Lane provides access to accelerated ship dates for qualifying products, with availability limited to one qualifying order per eligible product, per day. The earliest possible Fast Lane ship dates close daily at 12:00 pm CST.
Contact your RotoMetrics representative or Maxcess Customer Service agent today to confirm eligibility and request Fast Lane scheduling. Once the daily Fast Lane capacity is filled, it is no longer available.
Product-specific limitations apply. Not all configurations qualify. Once the daily Fast Lane capacity is filled, it is no longer available.
Key Rules of RotoMetrics Fast Lane
- One total Fast Lane order per eligible product, per day
- Product quantity limited to (1) per order
- Fast Lane ship dates close daily at 12:00 pm CST
- New orders only; repair orders are not eligible
- Ground shipping is not permitted
- Fast Lane does not replace complaint resolution processes
- Product-specific limitations apply
What is RotoMetrics Fast Lane?
Fast Lane is an expedited production option designed to help RotoMetrics customers meet critical deadlines when timing matters most.
To protect manufacturing flow and ensure commitments can be met, Fast Lane capacity is intentionally limited. Eligible orders are manufactured at the RotoMetrics facility in Eureka, Missouri, and are available to customers across North and South America.
Fees
- $250 or 25 percent of product value, whichever is greater
- Fast Lane fee will be added as a separate order line
RotoMetrics Fast Lane: Eligible Products, Lead Times and Limitations
RD250 Solid Die
- Fast Lane lead time: 2 days
- Up to 200-inch engraving
- Up to 200 corners
- Up to 30 cavities
- .045 to .060 inch depth
RD100 Solid Die
- Fast Lane lead time:
- RD100 (less than 6.6 PD): 4 days
- RD100 (6.6 PD and greater): 5 days
- Up to 200-inch engraving
- Up to 200 corners
- Up to 30 cavities
- .045 to .060 inch depth
RD300 (less than 6.6 PD)
- Fast Lane lead time:
- RD300 (less than 6.6 PD): 4 days
- RD300 (6.6 PD and greater): 6 days
- Up to 200-inch engraving
- Up to 200 corners
- Up to 30 cavities
- .045 to .060 inch depth
AccuBase™ Magnetic Cylinder
- Fast Lane lead time: 4 days
- Up to 200 inches total body surface (length x repeat)
Explore AccuBase Magnetic Cylinders
RD90 Anvil
- Fast Lane lead time: 3 days
- Up to 4-inch diameter
- Up to 24-inch length
MU100 Anvil
- Fast Lane lead time: 5 days
- Up to 4-inch diameter
- Up to 24-inch length
PC Integral Cylinder
- Fast Lane lead time: 3 days
- Not available for Labelmaster 440
- No anodizing
Frequently Asked Questions About RotoMetrics Fast Lane
How should I request a Fast Lane order?
Request Fast Lane from your CSR at the time of ordering. Availability is limited and will be reviewed before approval.
What are the criteria for Fast Lane orders?
Fast Lane is limited to one total order per eligible product, per day. Product-specific limitations apply.
Which regions may use Fast Lane?
Fast Lane is available to RotoMetrics customers across North and South America and is manufactured at our Eureka, Missouri, facility.
Which manufacturing locations support Fast Lane?
Fast Lane orders are produced at the RotoMetrics facility in Eureka, Missouri.
What is the cutoff time for early shipment?
The cutoff time for the earliest Fast Lane ship date is noon CST daily.
Can orders be added after booking?
No. Orders must be scheduled as Fast Lane at the time of booking.
Are repair orders eligible for Fast Lane shipping?
No. Only qualifying new orders are eligible.
What if my order does not qualify for RotoMetrics Fast Lane?
Rush requests may still be submitted using the normal process, though approval is less likely.